Gold Processing Plant After Mining

A standard cylindrical mold of length x diameter of 72 mm 36 mm was prepared using the sand to be tested. the active clay content and moisture content were kept at around 810 and 810, respectively. sample was placed in a universal testing machine utm and load was applied.

  1. Home > 
  2. Gold Processing Plant After Mining

Related News

Efficient machines